Case Studies (1)

Huttons Farm, Hambledon, Nr. Henley

 
     
Huttons Farm is a truly outstanding property combining traditional aspects within predominately new build accommodation. The building services include high specification domestics and heating systems, trench heating, gas fired boilers, wet under floor heating, swimming pool plant, all installed sympathetically to suit the traditional bespoke feeling the property provides.   Key facts:
Client: Private client
Consultant: Vector Design
Architect: AKH Architects
Main contractor: Ellmer Construction
Start date: September 2006
Completion date: September 2009
 
 

The Chase, Hampshire

 
‘The Chase’ is a traditional style property located on a hillside overlooking the Hampshire countryside. The building services include high specification domestic and heating systems, ground source heat pump, oil back-up boilers, wet under floor heating, swimming pool plant and a solar powered hot water system, all installed sympathetically to suit the traditional bespoke feeling the property provides.   Key facts:
Client: Private client
Consultant: Martin Thomas Associates
Architect: C H Design
Main contractor: RW Armstrongs
Start date: January 2009
Completion date: December 2009
 
 

Rose Hill, Oxford

 
Rose Hill, Oxford. Re-Generation Scheme   Key facts:
Client: Oxford Citizens Housing and Taylor Wimpey Oxfordshire
Consultant: Inspire Consulting
Main contractor: Taylor Wimpey Oxfordshire
Start date: March 2007
Completion date: Due 2011
 
 

Oakland’s, St. Albans

 
This demanding project to re-furbish the existing college buildings into luxury apartments. Together with the construction of twelve new blocks of apartments. The project also boasts a gym for the residents and two underground car parks. The total scheme of 267 apartments is due for completion by summer 2011.

Warburton Building Services Limited were involved from the early stages, developing the design of the mechanical services installation. This new installation included a district heating system to 72 apartments, which includes a combined heat & power plant.
  Key facts:
Client: Nicholas King Homes
Consultant: Warburton Building Services Limited
Start date: March 2007
Completion date: Due 2011
 
 

Housing development in Wokingham

 
Housing development in Wokingham   Key facts:
Client: Taylor Wimpey Oxfordshire
Start date: March 2007
Completion date: May 2010
 
 

Wootton & Dry Sandford Community Centre

 
This project to re-furbish the existing community centre into an impressive new community centre was a complex project. Warburton Building Services Limited were involved from the early stages, developing the design of the mechanical services installation. This new installation included a state of the art controls system with individual heating circuits to multiple function rooms and the main hall. A stand alone Children’s Centre was also part of the installation. This building had an independent plumbing & heating system.   Key facts:
Client: W & DS Community Centre
Consultant: CBG
Architect: Frankham Constancy
Main contractor: RMD Builders Ltd
Start date: November 2009
Completion date: April 2010
     