Huttons Farm, Hambledon, Nr.
Henley |
| |
 |
|
 |
| |
|
|
| Huttons Farm is a
truly outstanding property combining traditional aspects within predominately
new build accommodation. The building services include high specification
domestics and heating systems, trench heating, gas fired boilers, wet under
floor heating, swimming pool plant, all installed sympathetically to suit the
traditional bespoke feeling the property provides. |
|
Key facts: Client: Private
client Consultant: Vector Design Architect: AKH
Architects Main contractor: Ellmer Construction Start date:
September 2006 Completion date: September 2009 |
| |
| |
The Chase, Hampshire |
| |
| The
Chase is a traditional style property located on a hillside overlooking
the Hampshire countryside. The building services include high specification
domestic and heating systems, ground source heat pump, oil back-up boilers, wet
under floor heating, swimming pool plant and a solar powered hot water system,
all installed sympathetically to suit the traditional bespoke feeling the
property provides. |
|
Key facts: Client: Private
client Consultant: Martin Thomas Associates Architect: C H
Design Main contractor: RW Armstrongs Start date: January
2009 Completion date: December 2009 |
| |
| |
Rose Hill, Oxford |
| |
| Rose Hill,
Oxford. Re-Generation Scheme |
|
Key facts: Client: Oxford Citizens Housing
and Taylor Wimpey Oxfordshire Consultant: Inspire
Consulting Main contractor: Taylor Wimpey Oxfordshire Start
date: March 2007 Completion date: Due 2011 |
| |
| |
Oaklands, St.
Albans |
| |
This demanding
project to re-furbish the existing college buildings into luxury apartments.
Together with the construction of twelve new blocks of apartments. The project
also boasts a gym for the residents and two underground car parks. The total
scheme of 267 apartments is due for completion by summer 2011.
Warburton
Building Services Limited were involved from the early stages, developing the
design of the mechanical services installation. This new installation included
a district heating system to 72 apartments, which includes a combined heat
& power plant. |
|
Key facts: Client: Nicholas King
Homes Consultant: Warburton Building Services Limited Start
date: March 2007 Completion date: Due 2011 |
| |
| |
Housing development in
Wokingham |
| |
| Housing
development in Wokingham |
|
Key facts: Client: Taylor Wimpey
Oxfordshire Start date: March 2007 Completion date: May
2010 |
| |
| |
Wootton & Dry Sandford
Community Centre |
| |
| This project to
re-furbish the existing community centre into an impressive new community
centre was a complex project. Warburton Building Services Limited were involved
from the early stages, developing the design of the mechanical services
installation. This new installation included a state of the art controls system
with individual heating circuits to multiple function rooms and the main hall.
A stand alone Childrens Centre was also part of the installation. This
building had an independent plumbing & heating system. |
|
Key facts: Client: W & DS Community
Centre Consultant: CBG Architect: Frankham
Constancy Main contractor: RMD Builders Ltd Start date:
November 2009 Completion date: April 2010 |
|
 |
|
| |
|
|
More Case Studies |
|
|