Housing development at Walnut Tree, Milton Keynes

 
 

Housing development at Hanslope

 
 

Connect 21, Fengate, Peterborough

 
Connect 21 is a development situated close to the centre of Peterborough just off of the A1139 with close access to the A1 (M). The initial building consists of six cores with 100 mixed private and rented 1 & 2 bedroom apartments.

This is the first phase of an extensive development of houses and apartments over the coming years. Heating and domestic services have been provided to each apartment with a mixture of both combination boilers and unvented fully pressurised systems installed. Subterranean tanks and pumps provide boosted cold water to each core.
Key facts:
Main contractor: Bellwinch Homes
Start date: February 2008
Completion date: March 2010
 
 

Kittiwake House, Slough

 
Kittiwake House is a development of 78 shared/rented 1 & 2 bedroom apartments situated in the centre of Slough.

Heating and domestic services have been installed to each property, with fully pressurised heating systems. An underground plant room has been installed containing a 7000 Litre cold water storage tank and pump set which provides boosted cold water to the entire development.
Key facts:
Main contractor: Hill Partnerships (Western) Ltd
Start date: February 2008
Completion date: February 2010
 
 

Enstone Manor, Oxfordshire

 
This project to convert agricultural buildings into an impressive Manor House was a complex and demanding one. Warburton Building Services Limited were involved from the very early stages of the plan, helping with the design of the mechanical services installation, lighting controls, audio systems, and the data and door access installations, as well as the general lighting and power circuits.

The first phases of this extensive project concentrated on the main house, while the second took in the outbuildings, indoor tennis court, sauna room, gym and equestrian barn which were all included in the design.
  Key facts:
Client: Private Client
Consultant: Vector Design
Architect: FPD Savills
Main contractor: Robin Muller Ltd
Start date: May 2002
Completion date: October 2005
 
 

Housing development at Northampton

 
This project was to redevelop a former shoe factory in the centre of Northampton into 40 residential units for both rented and shared accommodation, with an additional new block added to the existing building.

Heating and domestic services have been installed to each property with the addition of a fire sprinkler system to the top floor duplex apartment.
Key facts:
Client: Hill Partnerships (Western) Ltd
Start date: January 2008
Completion date: September 2009
   
     